检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]杭州市水文水资源监测总站,浙江杭州310016 [2]杭州市南排工程建设管理处,浙江杭州310020
出 处:《浙江水利水电专科学校学报》2012年第4期13-19,24,共8页Journal of Zhejiang Water Conservancy and Hydropower College
基 金:国家自然科学基金资助项目(51109054)
摘 要:利用典型洪水资料分析了洪水的地区组成,采用伯努利方程二分法计算了分水江水库不同下泄流量下毕浦电站建坝前后分水江区间河段洪水水面线.表明随分水江水库下泄流量增加,相邻两条水面线间水位差和上下游水位变幅变小;毕浦电站建坝后,对区间河段水面线影响较大,坝址附近水位大幅抬升,越向上游抬升幅度越小.该结论可为区域防洪减灾、河道整治、交通水利工程规划设计等提供参考.Based on typical flood data, the flood region composition is analysed with Bernoulli equation dichotomy to calculate the water discharge to BiPu Power Station and the water line before and after the flood flow to the dam in Fenshui River reach. The result shows that along with discharge increases, the water head between the two adjacent surface and the water range along the upstream and downstream become smaller. The construction of BiPu Dam influences the water line in interval reach to a great extent, the water line near the dam site rises sharply while the upstream lifts in smaller range. The conclusion offers reference for regional flood prevention, disaster reduction, and river regulation, as well as the traffic design of hydraulic engineering program.
分 类 号:TV697.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40