以A电站工程为例剖析EPC模式下水电站工程的风险管理  被引量:6

Taking A Power Station Project as Example to Analyze Risk Management for Power Station in EPC model

在线阅读下载全文

作  者:邵敏[1] 王丰[1] 刘懿辉[1] 张洁[1] 

机构地区:[1]中国水电顾问集团成都勘测设计研究院,成都610072

出  处:《黑龙江水利科技》2012年第12期4-7,共4页Heilongjiang Hydraulic Science and Technology

摘  要:论述了国内EPC总包模式的的风险管理,重点分析了水电站总承包项目的风险特点以及风险防范的应对方法;并通过实例,剖析了建设过程中的合同风险、设计风险、采购风险以及施工风险的成因及防范措施。As an important part of project management, engineering contract management runs through the whole managing progress. Whether it is successful or not,the contract management will directly reflect level of the management and influence the project's benefits. Therefore,how to do the contract management work well is the common topic among the construction industry. Combined with the actual work, this paper describes how to do the contract management work, especially, from the contract management guarantee system and the contract specific implementation measures and supervision in the process of contract implementation, etc.

关 键 词:EPC模式 风险特点 风险规避 风险成因 风险控制 

分 类 号:TV737[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象