1000MW机组主厂房单边钢次梁与混凝土框架主梁劲型预埋铁焊接节点研究  被引量:3

Study on embedded steel welding joint of single side steel secondary beam and concrete frame girder for 1000MW unit of main factory building

在线阅读下载全文

作  者:周柏睿 

机构地区:[1]河南省电力勘测设计院,河南郑州450007

出  处:《工程建设》2012年第6期51-52,73,76,共4页Engineering Construction

摘  要:通过对主厂房结构方案的空间需求分析,研究常见的主厂房楼层钢次梁与框架主梁节点模型的形式及特点,提出在1 000 MW机组主厂房楼层钢次梁与框架主梁连接采用劲型预埋铁焊接方式,以节省挑耳空间,方便施工,缩短施工周期,减少建设期投资。Through analysis of space need for the structure scheme of the major factory building, the common types and characteristics of joint model for steel secondary beam and frame girder of the major factory building were studied,it was proposed that adopting the embedded steel welding mode for connection of steel secondary beam and frame girder in 1000MW unit of main factory building can save projecting cave space, facilitate construction, shorten construction period and reduce construction investment.

关 键 词:单边钢次梁 框架主梁 劲型预埋铁 焊接 

分 类 号:TU375.4[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象