检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]哈尔滨工业大学市政环境工程学院,哈尔滨150090
出 处:《太阳能学报》2013年第1期154-159,共6页Acta Energiae Solaris Sinica
基 金:"十二五"国家科技支撑计划重大项目(2012BAJ06B02)
摘 要:提出一种具有快速除污功能的干式壳管式污水源热泵机组,并对其在桑拿洗浴中心的运行特性进行现场测试。实时监测生产热水过程中机组的运行参数,并验证污水蒸发器的除污特性。研究结果显示:热水加热时间为23min/次,供应热水量约120L/次,温度为51℃,可充分满足用水温度需要;机组COP最高达3.67,最低为2.51,平均值为2.91;30d内污水蒸发器换热量由8300W降低到5600W,约为干净状态换热量的67.5%,除污后污水换热量提升到8100W,基本恢复初始换热量,除污型污水换热器除污和换热效率较高;除污前后,蒸发温度由3.9℃提高到6.1℃,表明该除污功能可大大改善换热系数。A dry-type wastewater source heat pump with function of de-fouling was presented, and then an experi- ment using this test rig was carried out in a sauna center. The unit operation parameters were real-time monitored. Also, effectiveness of de-fouling function of the wastewater evaporator was verified through a field test. Results showed that time for water heating is 23 minutes/once and supplying volume of hot water is 120L/once and temper- ature of supplying hot water is 51 ℃ which is high enough for hot water users ; The maximum COP is 3.67, mini- mum is 2.51 and mean value in the heating process is 2.91. Results also implied that heat transfer rate of wastewater evaporator dropt from 8300W to 5600W during 30-day running which is 67.5% of the initial one. It was enhanced to 8100W by the function of de-fouling which was equal to the initial heat transfer rate approximately; Af- ter de-fouling, evaporation temperature increased from 3.9℃ to 6.1 ℃, which indicates the function of de-fouling can improve the heat transfer coefficient effectively.
关 键 词:干式污水源热泵 除污 洗浴废水 废热回收 COP
分 类 号:TU831.6[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222