检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:范兴祥[1] 汪云华[1] 董海刚[1] 吴跃东[1] 李柏榆[1] 赵家春[1] 李博捷[1]
机构地区:[1]昆明贵金属研究所稀贵金属综合利用新技术国家重点实验室,云南昆明650106
出 处:《湿法冶金》2013年第1期13-15,共3页Hydrometallurgy of China
摘 要:研究了用硫酸溶液从澳大利亚某红土镍矿中浸出镍,考察了酸度、浸出时间和矿石粒度对镍浸出率和酸耗的影响。试验结果表明:矿石粒度对镍浸出率影响较大;在酸度2.51mol/L、矿石粒度-8~+2mm、两段逆流浸出时间均为12d的最佳条件下,镍浸出率为78.52%,浸出液中残酸质量分数小于5%,酸耗在64t/t镍左右。该工艺投资少,流程短,工艺简单。Leaching of nickel in laterite ore from Australia using sulfuric acid has been researched. The effects of acid concentration, leaching time and ore particle on leaching rate of nickel and acid consumption were examined. The results showed that ore particle had obvious influence on the leaching rate of nickel. The reasonable process conditions were determined as fellows, acid concentration was 2.51 mol/L, ore particle was -8~+2 mm, and leaching time was 12 d. Under the optimum conditions, the leaching rates of Ni was 78.52%. Residual acid concentration in the leaching solution was less than 5%, the acid consumption was at around 60 tons acid/ton nickel. The process had the characteristics of small investment, short and simple.
分 类 号:TF815[冶金工程—有色金属冶金]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3