钢箱-混凝土拱桥拱肋竖转成拱施工技术分析  

Analysis on Construction Technologies of Ribs Vertical Transfer on Steel Box-Concrete Composite Arch Bridge

在线阅读下载全文

作  者:王隼[1] 杨武 

机构地区:[1]重庆市公路工程质量检测中心,重庆400060 [2]上海大学土木工程系,上海200092

出  处:《中国西部科技》2013年第2期68-70,共3页Science and Technology of West China

摘  要:本文以重庆笋溪河大桥为例,总结了钢箱-混凝土拱桥拱肋的竖转成拱的主要施工流程,对施工过程中的钢箱竖向拼装、竖转铰的设置、钢箱转体施工,以及钢箱的合拢等主要阶段进行了详细的分析,并对其中的钢箱节段拼装线行调整和对接等关键施工技术进行了探讨,以达到指导同类桥梁施工的目的。This article took the Sunxi River Bridge as an example, summarized main construction procedures of ribs vertical transfer on steel box-concrete composite arch bridge, and analyzed the main stages in construction process, such as vertical assembly of steel box, the set up of vertical rotating hinge, swivel construction of steel box, and close of steel box. We also discussed the key construction technologies in assembly line adjustments and docking of the steel box segments.

关 键 词:钢箱-混凝土 拱肋 竖转成拱 

分 类 号:U448.22[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象