机构地区:[1]贵州大学矿业学院,贵州贵阳550004 [2]贵州大学瓦斯灾害防治与煤层气开发研究所,贵州贵阳550025
出 处:《煤炭科学技术》2013年第1期78-81,共4页Coal Science and Technology
基 金:贵州省教育厅自然科学重点资助项目(黔教科【2011】034号);贵州省科技厅工业攻关资助项目(黔科合GY【2012】3054);国家自然科学基金资助项目(51264004)
摘 要:选用新安煤矿17号煤层111706工作面作为本煤层顺层钻孔预抽瓦斯技术试验区,研究了17号煤层合理的预抽瓦斯技术参数值。结果表明:采用交叉布孔法的瓦斯预抽量可提高40%,94 mm大直径钻孔瓦斯预抽采量比直径65 mm钻孔提高34%;钻场内钻孔抽采瓦斯浓度比巷道钻孔抽采瓦斯浓度高将近1倍,封孔深度应不小于5 m。建议施工双向抽采钻孔来覆盖全工作面,掘进工作面钻孔深度控制在100 m内。No.111706 coal mining face in No.17 seam of Xin'an Mine was selected as a trial zone of the gas pre-drainage technology with the boreholes drilled along the mining seam.The rational parameter values of the gas pre-drainage technology for No.17 seam were studied.The results showed that with the borehole cross layout method,the gas pre-drainage value could be improved by 40% and the gas pre-drainage value with the 94 mm large diameter boreholes would be 34% higher than the gas pre-drainage value with the 65 mm diameter boreholes.The borehole gas drainage concentration within the borehole drilling site would be one time higher than the borehole gas drainage concentration in the gateway,the borehole sealing depth should not be less than 5 m.The paper proposed that two directional gas drainage boreholes should be drilled to cover the whole coal mining face and the borehole depth in the gateway driving face should be controlled within 100 m.
分 类 号:TD712[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30