检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国家电力公司电力自动化研究院,南京210003 [2]广东省电力工业局,广州510600
出 处:《电力系统自动化》2000年第11期42-44,共3页Automation of Electric Power Systems
摘 要:将超短期负荷预报 ( SSTLF)用于电力系统自动发电控制 ( AGC) ,让机组出力随时与系统负荷的变化同步 ,实现了 AGC的超前控制 ,使 AGC具有了预见的能力。提出了 2种算法 :一种是将负荷预报分量作为调节功率处理 ;另一种是将负荷预报分量作为基本功率处理。这主要取决于AGC控制区域的具体情况。该方法在广东省电网A new automatic generation control (AGC) strategy called AGC--IN-ADVANCE is proposed. It makes traditionalAGC have a predictable capability of making control in advance. The principle is to control generation power changingsimultaneously with the system load variation predicted by super--short--term load forecasting (SSTLF). Based on thesituation of AGC control area, two practical realization methods of this strategy are introduced. One is taking the results ofload forecasting as a regulation component to modify each generation unit's control signal decided by the traditional areacontrol error (ACE), while another is taking that as a basic component for the specified generation units. This approach hasbeen implemented in the EMS of Guangdong Province. It has been shown that it's practical and valid.
分 类 号:TM761[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15