利用超短期负荷预报实现AGC的超前控制  被引量:46

AGC-IN-ADVANCE BASED ON SUPER-SHORT-ERM LOAD FORECASTING

在线阅读下载全文

作  者:高宗和[1] 丁恰[1] 温柏坚 姚建国[1] 

机构地区:[1]国家电力公司电力自动化研究院,南京210003 [2]广东省电力工业局,广州510600

出  处:《电力系统自动化》2000年第11期42-44,共3页Automation of Electric Power Systems

摘  要:将超短期负荷预报 ( SSTLF)用于电力系统自动发电控制 ( AGC) ,让机组出力随时与系统负荷的变化同步 ,实现了 AGC的超前控制 ,使 AGC具有了预见的能力。提出了 2种算法 :一种是将负荷预报分量作为调节功率处理 ;另一种是将负荷预报分量作为基本功率处理。这主要取决于AGC控制区域的具体情况。该方法在广东省电网A new automatic generation control (AGC) strategy called AGC--IN-ADVANCE is proposed. It makes traditionalAGC have a predictable capability of making control in advance. The principle is to control generation power changingsimultaneously with the system load variation predicted by super--short--term load forecasting (SSTLF). Based on thesituation of AGC control area, two practical realization methods of this strategy are introduced. One is taking the results ofload forecasting as a regulation component to modify each generation unit's control signal decided by the traditional areacontrol error (ACE), while another is taking that as a basic component for the specified generation units. This approach hasbeen implemented in the EMS of Guangdong Province. It has been shown that it's practical and valid.

关 键 词:超短期负荷预报 自动发电控制 调度自动化 电网 

分 类 号:TM761[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象