检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北电力大学,河北保定071003
出 处:《电力系统自动化》2000年第13期57-59,共3页Automation of Electric Power Systems
摘 要:城市 1 0 k V配电网线路分段是提高配电网供电可靠性的有效措施。文中对确定城市 1 0 k V配电网线路最优分段数的原则进行了分析研究 ,通过技术经济分析 ,采用成本—收益分析法建立了一种确定线路最优分段数的数学模型 ,并导出了相应的算法。One way of enhancing reliability of 10 kV distribution network is to divide the feeder into sections. The principle ofoptimizing the number of sections of 10 kV distribution network feeder is studied. Through the technical and economicanalysis, the paper describes how to determine the number of sections with a 10 kV power line using cost--profit method. Amathematics model is established according to this method and corresponding algorithm is also given. The computation resultsof case study prove the accuracy and feasibility of the proposed method.
分 类 号:TM715[电气工程—电力系统及自动化] TM727.2
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117