检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《江苏电机工程》2013年第1期26-29,共4页Jiangsu Electrical Engineering
摘 要:智能变电站中合并单元设置与否应根据工程实际情况进行分析比较,以求整个设计方案更加合理、经济、资源利用最大化。针对智能变电站采用常规互感器的设计方案,对合并单元设置与不设置2种方式的优缺点进行了比较,并根据合并单元安装位置的不同,阐述了合并单元设置与否的影响因素。结合智能变电站工程建设实例,给出了2种方式下详细的技术、经济指标比较,提出了智能变电站合并单元是否设置的合理建议。It is necessary for analyzing and comparing the configuration scheme of with or without merging unit in smart substations based on practical engineering situation. Good energy efficiency and low engineering cost can be achieved because of a good configuration scheme. Due to the smart situation which applied conventional mutual inductors to sample,the advantage and shortage of the two schemes for merging unit are compared. According to the different locations of merging unit in smart substation, the influencing factors of with or without merging unit are illuminated. Finally, the detailed technical and economic index comparison of the two schemes are given based on a construction project of smart substation,and the reasonable suggestions on the choices of with or without merging unit are put forward.
分 类 号:TM63[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249