检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南工程职业技术学院,长沙410151 [2]华润置地有限公司,长沙410000
出 处:《建筑技术》2013年第2期147-149,共3页Architecture Technology
摘 要:通过砖混结构改造实例,介绍了先施工托换结构,后拆除承重墙的托换技术。包括托换梁、托换柱的设计方案及在施工过程中为保证施工质量及安全所采取的措施。该类改造工程先施工托换结构,再凿除墙体,避免了先凿除墙体、后设置托换结构方案中支撑楼面荷载的难度和风险,可为同类设计提供参考。Based on brick and concrete structure reconstruction practices, introductions are made on underpinning technique of erecting underpinning structure before dismantlement of load-hearing wall, including design scheme of underpinning beam and column and measures for ensuring construction quality and safety during construction. It is found that the construction method of erecting underpinning structure before removing wall could avoid construction difficulties often encountered by reverse construction sequence,providing ,~aluabie references for similar projects.
分 类 号:TU746.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145