检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:YANG QianSuo SONG JunHao LI Duo ZHANG Jie YANG GuoWei
出 处:《Chinese Science Bulletin》2013年第7期642-647,共6页
基 金:supported by the National Key Technology R&D Program (Grant No. 2009BAG12A03);the National Natural Science Foundation of China (Grant No.10472123)
摘 要:In order to accelerate a heavy train model with great dimensions to a speed higher than 300 km h?1 in a moving train model testing system,compressed air is utilized to drive the train model indirectly.The gas from an air gun pushes the piston in an accelerating tube forward.The piston is connected to the trailer through a rope,and the trailer pulls the train model to the desired speed.After the testing section,the train model enters the deceleration section.The speed of the train model gradually decreases because of the braking force of the magnetic braking device on the bottom of the train model and the steel plates fixed on the floor of this device.The dissipation of kinetic energy of the trailer is also based on a similar principle.The feasibility of these methods has been examined in a 180 m-long moving train model testing system.The speed of the trailer alone reaches up to 490 km h-1.Consequently,a 34.8 kg model accelerates up to 350 km h?1;the smooth and safe stopping of the model is also possible.In order to accelerate a heavy train model with great dimensions to a speed higher than 300 km h1 in a moving train model testing system, compressed air is utilized to drive the train model indirectly. The gas from an air gun pushes the piston in an accelerating tube forward. The piston is connected to the trailer through a rope, and the trailer pulls the train model to the de- sired speed. After the testing section, the train model enters the deceleration section. The speed of the train model gradually decreases because of the braking force of the magnetic braking device on the bottom of the train model and the steel plates fixed on the floor of this device. The dissipation of kinetic energy of the trailer is also based on a similar principle. The feasi- bility of these methods has been examined in a 180 m-long moving train model testing system. The speed of the trailer alone reaches up to 490 km h-1. Consequently, a 34.8 kg model accelerates up to 350 km h-1; the smooth and safe stopping of the model is also possible.
关 键 词:火车模型 减速段 试验系统 制动装置 间接驱动 压缩空气 空气喷枪 动能耗散
分 类 号:U463.5[机械工程—车辆工程] TS958.16[交通运输工程—载运工具运用工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15