检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水利水电建设工程咨询西北公司,西安710075
出 处:《西北水电》2012年第A02期52-57,共6页Northwest Hydropower
摘 要:糯扎渡水电站心墙堆石坝填筑规模巨大,填筑料品种繁多,大坝心墙采用掺砾石土料,在中国高土石坝中尚属首次。文章结合该工程设计指标,介绍坝体填筑参数,探讨在高施工强度、高质量标准前提下,如何快速、准确得出坝体压实检测结果,以供同类型超高土石坝工程设计与施工参考。Embankment of the dam with cutoff wall, Nuozhadu Hydropower Project, is in a huge quantity. The embankment materials are various. The cutoff" wall is built by soil with gravel mixed. This is the first time in high earth-rock fill dam in China. In combination with design indicators of the project, in this paper, parameters of dam body embankment are introduced. In precondition of high construction strength and high quality standard, how to obtain the inspection results of dam body compaction rapidly and accurately is studied so as to provide design and construction of similar super-high earth-rock fill dam with reference.
分 类 号:TV42[水利工程—水工结构工程] TV541.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.120