糯扎渡水电站溢洪道抗冲耐磨混凝土施工工艺控制要点  被引量:3

Key Control Points of Technology for Scouring-and Wearing-Resistance Concrete Placement of Spillway,Nuozhadu Hydropower Project

在线阅读下载全文

作  者:李小明 郝亚红 董立安 

机构地区:[1]中国水利水电建设工程咨询西北公司,西安710075

出  处:《西北水电》2012年第A02期79-83,共5页Northwest Hydropower

摘  要:糯扎渡水电站溢洪道抗冲耐磨混凝土施工难度大,各道施工工艺要求高。通过对溢洪道抗冲耐磨混凝土配合比设计、拌和物质量控制、运输、现场浇筑、滑模施工、温控、养护等方面各道施工工艺的控制,保障了糯扎渡水电站抗冲耐磨混凝土高标准的按期完成施工。The scouring- and wearing-resistance concrete placement of spillway, Nuozhadu Hydropower Project, is difficult in construc- tion. The construction technology for each working procedure is strictly required. Through controls of working procedures in terms of de- sign of mix ratio for scouring- and wearing-resistance concrete for the spillway, mixture quality control, mixture transportation, site placement, application of sliding formworks, temperature control, curing operation, etc, construction of the scouring- and wearing-re- sistance concrete placement for the spillway, Nuozhadu Hydropower Project, is fulfilled as scheduled and required.

关 键 词:抗冲耐磨 混凝土 施工 工艺 控制要点 

分 类 号:TV651.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象