机构地区:[1]中国水利水电建设工程咨询西北公司,西安710075
出 处:《西北水电》2012年第A02期79-83,共5页Northwest Hydropower
摘 要:糯扎渡水电站溢洪道抗冲耐磨混凝土施工难度大,各道施工工艺要求高。通过对溢洪道抗冲耐磨混凝土配合比设计、拌和物质量控制、运输、现场浇筑、滑模施工、温控、养护等方面各道施工工艺的控制,保障了糯扎渡水电站抗冲耐磨混凝土高标准的按期完成施工。The scouring- and wearing-resistance concrete placement of spillway, Nuozhadu Hydropower Project, is difficult in construc- tion. The construction technology for each working procedure is strictly required. Through controls of working procedures in terms of de- sign of mix ratio for scouring- and wearing-resistance concrete for the spillway, mixture quality control, mixture transportation, site placement, application of sliding formworks, temperature control, curing operation, etc, construction of the scouring- and wearing-re- sistance concrete placement for the spillway, Nuozhadu Hydropower Project, is fulfilled as scheduled and required.
分 类 号:TV651.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.106