达克曲克水电站溢洪道空化空蚀问题研究  被引量:4

Research on cavitation problem for spillway in ducky cheuck hydropower station

在线阅读下载全文

作  者:颜婷[1] 刘韩生[1] 

机构地区:[1]西北农林科技大学水利与建筑工程学院,陕西杨凌712100

出  处:《水资源与水工程学报》2012年第5期77-80,共4页Journal of Water Resources and Water Engineering

摘  要:国内首个成功运用通气减蚀措施避免泄水建筑物空蚀的工程是冯家山水库。与冯家山大坝一样,达克曲克水电站属中坝工程,最大坝高62.6m,有必要讨论表孔溢洪道泄槽空化空蚀问题。采用时启燧等提出的掺气挑坎临界坎高的经典算法以及空化空蚀相关规范,通过理论计算与实际分析表明:①在溢洪道泄槽段无需设置掺气挑坎;②在没有掺气减蚀措施的情况下,计算施工不平整度按要求控制可以有效避免空化空蚀。Fengjiashan Reservoir is the first engineering by successfully using measures of cavitation control by aeration to avoid the cavitation damage of water release structuree in China.The same as Fengjiashan dam,Ducky Cheuck hydropower station is the medium-sized engineering whose maximum dam height is 62.6 meters,so it is necessary to discuss the problem of cavitation and cavitation damage of the spillway chute.Used the classic algorithm put forward by Shi Qisui to calculate the critical ridge height of aerated bucket and the specification of cavitation damag,through theoretical calculation and the practical analysis,it shows that ① it is unnecessary to set up aerated bucket on the chute of spillway;②by controlling the construction irregularity according to the specification can effectively avoid cavitation and cavitation damag although in the case of no measures of cavitation control by aeration.

关 键 词:空化空蚀 溢洪道 掺气挑坎 施工不平整度 

分 类 号:TV131.61[水利工程—水力学及河流动力学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象