检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西北农林科技大学水利与建筑工程学院,陕西杨凌712100
出 处:《水资源与水工程学报》2012年第5期77-80,共4页Journal of Water Resources and Water Engineering
摘 要:国内首个成功运用通气减蚀措施避免泄水建筑物空蚀的工程是冯家山水库。与冯家山大坝一样,达克曲克水电站属中坝工程,最大坝高62.6m,有必要讨论表孔溢洪道泄槽空化空蚀问题。采用时启燧等提出的掺气挑坎临界坎高的经典算法以及空化空蚀相关规范,通过理论计算与实际分析表明:①在溢洪道泄槽段无需设置掺气挑坎;②在没有掺气减蚀措施的情况下,计算施工不平整度按要求控制可以有效避免空化空蚀。Fengjiashan Reservoir is the first engineering by successfully using measures of cavitation control by aeration to avoid the cavitation damage of water release structuree in China.The same as Fengjiashan dam,Ducky Cheuck hydropower station is the medium-sized engineering whose maximum dam height is 62.6 meters,so it is necessary to discuss the problem of cavitation and cavitation damage of the spillway chute.Used the classic algorithm put forward by Shi Qisui to calculate the critical ridge height of aerated bucket and the specification of cavitation damag,through theoretical calculation and the practical analysis,it shows that ① it is unnecessary to set up aerated bucket on the chute of spillway;②by controlling the construction irregularity according to the specification can effectively avoid cavitation and cavitation damag although in the case of no measures of cavitation control by aeration.
分 类 号:TV131.61[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49