检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]广西科技大学(筹)土木建筑工程学院,广西柳州545006
出 处:《广西工学院学报》2012年第4期13-17,共5页Journal of Guangxi University of Technology
基 金:广西工学院自然科学基金(院科自1166216)资助
摘 要:结合多项嵌岩桩检测实例,系统地对沉渣厚度超标、桩端未嵌岩、桩底出现岩溶裂隙、桩底出现软弱夹层等嵌岩缺陷的基桩进行原因分析,并提出相应的补强处理方案,强化桩位超前钻的实施,建议在必要时增加超前钻孔数以充分了解桩底岩土性状,将隐患控制在基桩施工之前,对保证岩溶地区桩基施工质量和安全有着重要意义.Based on some foundation projects, the defect piles of thick sediment and insufficient bottom bearing capacity and the bearing stratum which appear crack and soft stratum are tested by cross hole sonic logging and core drilling method. These piles are analyzed systematically, and the reinforcement treatments of defective piles are correspondingly discussed. The pre-construction exploration drilling is very important and the number of drilling hole will be increased if it is necessary. These can identify the geology environment to control the hidden danger before pile construction. It is of great significance to ensure the quality and safety of pile foundation construction in karst area.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.107.122