旁多水利工程坝基深厚覆盖层渗流及渗透稳定性分析  被引量:2

Stability analysis of seepage and permeability for thick overburden layer of dam foundation of Pangduo hydro project

在线阅读下载全文

作  者:郭建业[1] 范景春[1] 刘清利[1] 陈全宝[1] 

机构地区:[1]中水东北勘测设计研究有限责任公司

出  处:《东北水利水电》2013年第2期6-7,12,共3页Water Resources & Hydropower of Northeast China

摘  要:旁多水利枢纽工程规模大,设计地震烈度高,坝基覆盖层深厚且地处高海拔地区,坝基防渗型式的确定是涉及工程安全与否的关键技术问题。文章首先论述了该工程坝基防渗设计方案的拟定,然后针对各方案进行了渗流计算,分析坝基覆盖层的渗流及渗透稳定特性,为坝基防渗设计方案的确定提供依据。The seepage type of dam foundation is key technique issue to affect the project safety for the Pangduo hydro -junction project. The project is located at high altitude area and has the large scale, the high design earthquake intensity and the thick overburden layer. The paper introduces the determination of the seepage design scheme for dam foundation, analyzes the seepage and permeability stability of overburden layer of dam foundation based on the seepage calculation of each scheme, which provides basis for the determination of seepage design scheme of dam foundation.

关 键 词:深厚覆盖层 防渗墙 渗流 渗透稳定 

分 类 号:TV64[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象