检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]Tunnel and Underground Engineering Research Center of Ministry of Education, Beijing Jiaotong University [2]Xiamen Road and Bridge Construction Group Co.Ltd.
出 处:《China Ocean Engineering》2013年第1期121-130,共10页中国海洋工程(英文版)
基 金:supported by the National Basic Research Program of China (973 Program,Grant No. 2010CB732104);the Fundamental Research Funds for the Central Universities (Grant No. 2011JBM133)
摘 要:As a kind of transportation mode for crossing channels, undersea tunnel has incomparable advantages for its directness, convenience, fastness, insusceptibility to weather conditions, and smaller influences on environments. In recent years, with the development of undersea tunnel construction, the design and construction technologies have been greatly enhanced. The first undersea tunnel in China has just been built. Waterproofing is the key technique of undersea tunneling. A new concept of waterproofing scheme of grouting, sealing, draining and divided sections was adopted in the construction of the tunnel based on the researches, the in-situ geological features, the astuteness of the current technology and the cost of construction. The structural details of the sealing and draining system are introduced to illustrate the salient features of the new waterproofing technique. It is hoped that experiences described in the paper can offer guidance for the construction of the extensive undersea tunnels in the coming years.As a kind of transportation mode for crossing channels, undersea tunnel has incomparable advantages for its directness, convenience, fastness, insusceptibility to weather conditions, and smaller influences on environments. In recent years, with the development of undersea tunnel construction, the design and construction technologies have been greatly enhanced. The first undersea tunnel in China has just been built. Waterproofing is the key technique of undersea tunneling. A new concept of waterproofing scheme of grouting, sealing, draining and divided sections was adopted in the construction of the tunnel based on the researches, the in-situ geological features, the astuteness of the current technology and the cost of construction. The structural details of the sealing and draining system are introduced to illustrate the salient features of the new waterproofing technique. It is hoped that experiences described in the paper can offer guidance for the construction of the extensive undersea tunnels in the coming years.
关 键 词:undersea tunnel WATERPROOFING sealing-draining system
分 类 号:U459.5[建筑科学—桥梁与隧道工程] TU231[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15