检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡泊[1] 辛颂旭[1] 白建华[1] 张运洲[1]
机构地区:[1]国网能源研究院,北京100052
出 处:《中国电力》2013年第1期1-6,共6页Electric Power
摘 要:介绍了我国太阳能发电开发规划、布局特点及存在的问题;基于建立的光伏发电出力特性指标,分析了大规模光伏发电并网对电力系统规划提出的新要求;提出了太阳能发电消纳研究方法,根据"十二·五"期间西北地区太阳能发电规划目标,分析了西北电网太阳能消纳能力,2015年,西北地区太阳能发电装机规模为1 320万kW,电网调峰能力不能满足光伏、风电等新能源消纳需求,需要跨区平衡消纳。The planning, layout characteristics and existing problems of solar power development in China are introduced. Based on the output characteristic index of PV generations, the new requirements of large-scale PV power integration is analyzed on the power system planning, and the analytical method of solar power accommodation is proposed. According to the planning targets of solar power generation of the “12th Five-Year Plan” period in the northwestern region, the solar power accommodation capacity of the northwest grid is studied. It is predicted that by the year of 2015, the installed solar power capacity in the northwestern region will reach 13.2 GW, and the balancing capability of the local power grid can' t meet the accommodation requirement of such new energies as PV and wind power. Trans-region balance is therefore needed for accommodation of new energy.
分 类 号:TM615[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.234