剡源水库坝基输水底涵高水头封堵方案及技术分析  被引量:5

Scheme of high head sealing of discharge culvert through dam foundation in Shanyuan Reservoir and its technical analysis

在线阅读下载全文

作  者:赖勇 

机构地区:[1]浙江省水利水电勘测设计院,浙江杭州310002

出  处:《水利水电技术》2013年第2期71-74,共4页Water Resources and Hydropower Engineering

摘  要:介绍了剡源水库除险加固过程中,在高水头、涵管埋深大、轴线弯曲、含钢衬、无进人条件等难题下,自坝顶施工平台对坝基浆砌石输水底涵进行成功封堵的方案设计及技术经验。结合本工程设计及施工阶段的封堵方案技术论证及方案变更情况,阐述坝下埋管封堵常用的坝顶灌浆、混凝土封堵、粘土套井封堵、倒挂井封堵以及混凝土防渗墙封堵等方案的技术特点、应用情况及其适用条件。The scheme design and technical experience of the successful sealing, facing with the problems such as high head, large embedded depth of culvert, bending axis, containing steel lining, no construction entrance, etc. , of the ma- sonry discharge culvert through dam foundation from the construction platform on the dam crest during the risk-elimination and strengthening of Shanyuan Reservoir are described herein. Based on the technical demonstration and scheme variation made on the sealing scheme during the design and construction phases of the project, the technical characteristics, applica- tion status and applicable conditions of the grouting from dam crest, concrete sealing, sealing with clay backfill jacket well, sealing with upside down hanging well, concrete cutoff, etc. conventionally adopted for sealing with embedded pipe under dam are expatiated as well.

关 键 词:坝下埋管 涵管 高水头 防渗墙 倒挂井 封堵 除险加固 剡源水库 

分 类 号:TV672[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象