检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山东大学土建与水利学院,济南250061 [2]大连理工大学建设工程学部,辽宁大连116024
出 处:《土木建筑与环境工程》2013年第1期86-95,共10页Journal of Civil,Architectural & Environment Engineering
基 金:国家自然科学基金重点项目(51208285);中国博士后科学基金(2012M521338);山东大学自主创新基金(2011GN051)
摘 要:通过数值模拟研究了多维地震激励下高压输电塔线体系地震响应。建立了输电塔线耦联体系三维有限元模型,考虑了输电线的几何非线性特征;依据《电力设施抗震设计规范》选取了不同场地的12条地震记录;利用非线性时程分析方法,分别研究了单维、双向和多维地震激励下输电塔线体系的地震响应。研究结果表明,输电塔线体系在多维地震激励下的响应明显地大于仅考虑单维地震激励,特别是仅考虑竖向地震激励的情况,在分析中忽略地震动的多维性将会低估结构的地震响应。为了得到精确的结构地震响应并更好地进行输电塔线体系的抗震设计,需要考虑多维地震输入。研究结果可为输电线路实际工程抗震设计提供参考。Seismic responses of power transmission tower-line system under multi-component excitations were analyzed by numerical simulation. A three-dimensional finite element model of transmission tower-line coupled system considering the geometric nonlinearity of transmission line was established. Twelve seismic records of different soil types were selected based on Code for Design of Seismic of Electrical Installations. Seismic responses of power transmission tower-line system under single component, two horizontal component and multi-component excitations were investigated using nonlinear time history analysis method, respectively. The results show that the responses of transmission tower-line system under multi- component excitations are significantly larger than those under single component excitation only, especially for considering vertical ground motion excitation only, and neglecting multiple nature of ground motion in analysis will underestimate the responses of the structure. To obtain an accurate seismic response and a better seismic design of transmission tower-line system, multi-component ground motion inputs need to be considered. The results provide reference for seismic design of transmission line practical engineering.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.111.63