检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051
出 处:《云南水电技术》2010年第1期11-17,共7页
摘 要:重力坝泄水建筑物水力计算是重力坝设计中非常重要的内容。本文系统地归纳了表孔、中孔、底孔在各种条件下的过流能力计算及水面线计算等方法,同时指出水力设计中应注意的问题,本文还对部分文献中有关计算公式中的错误作了更正。本文可供初参加设计工作的年轻工程师参考。The hydraulic calculation for the water discharge structure of the gravity dam is a very important part in the design of a gravity dam. This article systematically summarises the calculation of overflow capacity of surface orifice, center orifice and the bottom orifice under various conditions along with the calculation of water surface profile, etc., and at the same time points out the notable problems in the hydraulic design. In some references, this article also corrects some errors in related calculation formulas.. This article can provide reference for the young engineers who just participate in the design work.
分 类 号:TV65[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.113