检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:覃永恒[1]
机构地区:[1]广西水利电力勘测设计研究院,广西南宁530023
出 处:《红水河》2000年第3期42-45,共4页Hongshui River
摘 要:基于GIS升压站设备小型化和对洞室围岩的新认识 ,介绍招标设计阶段将百色水利枢纽地下水电站的主变压器及升压站布置于地下洞室中 ,在设计中突破了规范和常规 ,以较小的围岩厚度尤其是上覆岩体厚度使布置更为合理与经济。经围岩稳定分析 ,结果表明洞室布置合理可行。Base on the new knowledge about cavity surrounding rock and the small_size for the equipments of GIS ,the main transformers and GIS step_up substation of Baise project are arranged in underground cavity with diabase in the stage of bidding design.The design makes a breakthrough in the standard and convention with less thickness,particularly the cover on the cavities of surrounding rock.The results of analysis shown that the arrangement are resonable and economic,and the cavities arrangement is more closed and characterized.
分 类 号:TM631.1[电气工程—电力系统及自动化] TV61[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145