检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王积军[1] 熊卫[1] 魏萍[1] 王胜[1] 回中伦[1]
机构地区:[1]黄河水利委员会勘测规划设计研究院,河南郑州450003
出 处:《红水河》2000年第3期46-51,共6页Hongshui River
摘 要:宝泉抽水蓄能电站地下厂房洞室群所处岩石综合评定属Ⅰ类围岩 ,采用喷锚支护作为永久支护。考虑洞室相互交叉及地应力的影响 ,喷锚支护按Ⅱ类围岩稳定所需要的支护抗力设计。喷锚支护设计以工程类比法初步选定支护参数 ,用极限平衡理论进行局部验算 ,并用有限元法评价喷锚支护整体加固效果。研究表明 ,地下厂房洞室群整体稳定。The surrouding rock of underground power house of Baoquan pump storage power station is synthetically classified as sort Ⅰ. The rock bolts are designed for permanent supports. Considering the effect of tunnels intersecting and crustal stress, the strength of rock bolts is designed to meet the resisting force which is necessary for the stable of sort Ⅱ surrounding rock. Support parameters are preliminary chosen with engineering analogism, and partially checked with rock ultimate equilibrium theory method. The total anchorage effects are also analysed with three_dimension finite element method. The results show that the tunnels are stable and safe.
分 类 号:TV554.12[水利工程—水利水电工程] TU923[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.239