检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Tara Abdulrazak Suguru Mori
机构地区:[1]Graduate School of Engineering, Hokkaido University, Sapporo 060-8628, Japan [2]Faculty of Engineering, Hokkaido University, Sapporo 060-8628, Japan
出 处:《Journal of Civil Engineering and Architecture》2012年第9期1138-1148,共11页土木工程与建筑(英文版)
摘 要:Post-war Iraq is a mix of potential opportunities, promising intentions, and difficult challenges. After 2003, the government adopted a program to manage the housing crisis and satisfy housing needs. Through a fieldwork survey, we aimed to present this program by reviewing the government targets, main housing problems, governmental legislations, and construction process. We found that the government abandoned its centralized role in its National Housing Project as it opened the door of Iraqi housing market to foreign and local investors. We also found that, considering the enormous need for housing the occupancy rate of the governmental housing units are so low and construction is also generally slow. We deduced that the pricing model of the government's national housing project is far from our general notion of public housing for low-income post-war people. Moreover, it is necessary for the government to formulate a clearer strategic vision and to adopt more innovative approaches to address effectively and rapidly the trade-offs of the short and long terms objectives of the reconstruction process in post-war Iraq.
关 键 词:Post-war public housing reconstruction process national housing project.
分 类 号:TU241[建筑科学—建筑设计及理论] D63[政治法律—政治学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249