振孔高喷技术在溧阳抽水蓄能电站下库土坝防渗中的应用  被引量:1

Application of Jet Grouting Technology in Seepage Control of Earth Dam in Lower Reservoir of Liyang Pumped-storage Power Station

在线阅读下载全文

作  者:毛建平 陈亚坤 

机构地区:[1]中国水利水电第十二工程局有限公司,浙江杭州310004

出  处:《水力发电》2013年第3期59-61,共3页Water Power

摘  要:溧阳抽水蓄能电站下库土坝坝基防渗采取振孔高喷防渗墙形式。施工过程中,通过及时调整施工参数,成功地保证了坝体填筑层的墙体厚度。试验检测结果表明,墙体外形尺寸规整、连续性好,渗透系数、抗压强度满足设计规范要求。The jet grouted cutoff wall is used as the seepage control of dam foundation in lower reservoir of Liyang Pumpedstorage Power Station. For guaranteeing the thickness of cutoff wall in dam filled layer, the parameters of jet grouting are timely adjusted during construction process. The test results show that the cutoff wall has a regular shape and size and good continuity, and the permeability coefficient and compressive strength meet the requirements of design specifications.

关 键 词:坝基防渗 振孔高喷技术 防渗墙 质量检测 下库土坝 溧阳抽水蓄能电站 

分 类 号:TV543.82[水利工程—水利水电工程] TV743

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象