金厂峪金矿碎石尾砂浇注胶结充填技术的应用  被引量:1

Application of cemented tailings backfill technology in Jinchangyu gold mine

在线阅读下载全文

作  者:冀炳信 黄玉柱 郭树林[2] 宋士生[2] 

机构地区:[1]河北金厂峪矿业有限责任公司 [2]长春黄金研究院

出  处:《黄金》2013年第2期44-46,共3页Gold

摘  要:通过室内试验测定了尾砂的特性以及充填体强度随料浆浓度和灰砂比的变化规律,结合金厂峪金矿现场实际需求确定了充填灰砂比,根据现场地形及生产需要设计了皮带输送两段搅拌造浆充填系统,并分别从充填工艺及充填系统建设两方面介绍了碎石尾砂浇注胶结充填技术在桑家峪矿区的应用。可为类似条件空区处理提供借鉴。The properties of tailings and the ,strength variation of filling body influenced by the concentration andcement-sand ratio was determined through the indoor tests. And according to actual needs of Jinchangyu gold mine, the cement-sand ratio was settled. To meet the needs of the terrain of the site and production, a belt conveying and two- stage stirring slurry filling system was designed. And from such two aspects as the filling process and filling system construction, the application of gravel tailings cemented filling technology in Jinchangyu gold mine is introduced. It canbe referential in goals with similar conditions.

关 键 词:碎石尾砂 浇注胶结充填 充填系统 充填工艺 

分 类 号:TD853.391[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象