水口水电站进水口快速闸门启闭机液压系统改造设计简介  被引量:2

Renovation design of hydraulic system of intake gate hoist at Shuikou Dam

在线阅读下载全文

作  者:沈燕萍[1] 金晓华[1] 

机构地区:[1]中国水电顾问集团华东勘测设计研究院,浙江杭州310014

出  处:《大坝与安全》2012年第6期8-10,共3页Dam & Safety

摘  要:福建水口水电站进水口快速闸门液压启闭机的液压系统原采用多机一站配置方案,存在共用油管、共用压力滤油器和共用油源阀组等,无法在发电机组不停机条件下进行检修、更换,以及液压缸内油液的压力会随着环境气温的升高而升高,导致无法泄压等问题,华东勘测设计研究院进行了相应改造设计。本文详细介绍了改造设计的主要内容和方案,以及改造后的运行状况,供参考。One pumping station for multi-machine was planned for the hydraulic system of intake gate hoist at Shuikou hydropower station, which caused the problems such as sharing of pipe, pressure oil filter and valve group for oil source control. Inspection, repairing and replacement couldnJt be carried out during operation of the power generator. Also, as the pressure in chamber couldn't release, the pressure rose due to the environment temperature. Aiming at the problems, renovation was implemented. This paper introduced the renovation design and the operation afterwards, for reference.

关 键 词:进水口 快速闸门 液压系统 改造设计 

分 类 号:TV664[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象