老挝南椰Ⅱ水电站全风化料筑坝技术的研究  被引量:1

Study on Wholly Weathered Material Dam Construction Technology for Nanye-Ⅱ Hydropower Project in Laos

在线阅读下载全文

作  者:代艳华[1] 张崇祥[1] 覃建付[1] 祁雪春 

机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051 [2]中国水利电力对外公司,北京100000

出  处:《云南水力发电》2013年第1期5-8,14,共5页Yunnan Water Power

摘  要:主要介绍了老挝南椰Ⅱ水电站粘土心墙土石坝坝基及坝料设计,针对坝基全风化覆盖较深,变形较大的特点及工程经济性。大坝部分基础坐落于全风化基岩,坝体大部分采用全风化料填筑,通过大量的试验资料与计算分析,方案是可行的,工程是经济的。The paper gives an introduction to the design of dam foundation and dam materials of the clay core earth-rock dam of Nanye-Ⅱ hydropower project in Laos. In view of wholly weathered overburden and deformation being deep and large in the foundation for the dam respectively and in view of economy of the project, most of the foundation for the dam is placed on the wholly weathered bed rock and most of the dam body is of wholly weathered material. The test and analysis results have proved the project feasible and economical.

关 键 词:老挝南椰Ⅱ水电站 粘土心墙土石坝 全风化料 筑坝 

分 类 号:TV222[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象