作 者:雷红军[1,2] 冯业林[1,2] 覃建付[1,2]
机构地区:[1]中国水电顾问集团昆明勘测设计研究院,云南昆明650051 [2]云南省水利水电土石坝工程技术研究中心,云南昆明650051
出 处:《云南水力发电》2013年第1期18-21,32,共5页Yunnan Water Power
摘 要:通过数值仿真手段,对云南澜沧江古水电站面板堆石坝进行应力变形计算,并针对坝体的位移、应力、应力水平以及面板的挠度变形进行了分析研究,并针对所拟定的三组计算参数方案进行敏感性分析。结果表明:古水面板堆石坝坝体及面板的应力变形分布符合一般规律,坝体堆石料的变形及面板的挠度变形均较为适中,坝料抗剪具有较高的安全裕度,总体来说,坝体及面板的应力变形在可控范围之内。By means of numerical simulation the paper carried out the stress deformation calculation of the concrete face rock-fill dam of Gushui Hydropower Project in Yunnan Province, made analysis and study according to displacement, stress and stress level of the dam body and deflection deformation of the con-crete face slab and conducted sensibility analysis according to the proposed 3 groups of calculation parame- ters. The results show that the stress deformation distribution of Gushui concrete face rock--fill dam body and concrete face slab conforms to the general laws, the deformation of the dam body rock-fill material and the deflection deformation of the concrete face are both moderate and the shear of the dam materials al-lows a large margin of safety. Taken as a whole, the stress deformation of either the dam body or the con-crete face is controllable.
分 类 号:TV641.43[水利工程—水利水电工程] TV314
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30