大倾角煤层综采设备配套的初步探讨  被引量:1

Preliminary Study of Fully Mechanized Mining Equipment Coordination for Coal Seam with Large Inclined Angle

在线阅读下载全文

作  者:曲臣 

机构地区:[1]中国煤炭科工集团沈阳设计研究院,辽宁沈阳110015

出  处:《能源与节能》2013年第2期18-20,共3页Energy and Energy Conservation

摘  要:通过对大倾角煤层采煤过程中存在的煤壁片帮、"三机"倒滑等问题的分析,结合典型大倾角煤层矿井的生产实际中工作面设备配套的实际现状,初步探讨实现大倾角煤层安全、高产、高效开采的设备配套的主要原则及应注意的几个关键问题。By analyzing the problems such as coal wall spalling existed in the mining process of coal seam with large inclined angle, and back slipping of the "three machines", combining with actual status of equipment coordination in working face in the typical coal seam mining with large inclined angle, preliminary studied the main principles and several key issues that should be paid attention to in the equipment coordination for realizing safe, productive, and efficient mining of coal seam with large inclined angle.

关 键 词:大倾角煤层 机械化开采 液压支架 煤壁片帮 

分 类 号:TD823.83[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象