基于DIMINE三维数字矿山软件系统的淌塘铜矿六中段开采方法研究  被引量:3

Mining Method Research of the Sixth Level of Tangtang Copper Mine Based on DIMINE 3D Mining Software System

在线阅读下载全文

作  者:冯兴隆[1,2] 吴东旭[1,2] 李剡兵 汪德文[1,2] 吴自勉 王毅 林吉飞[4] 

机构地区:[1]玉溪矿业有限公司,云南玉溪653100 [2]玉溪矿业矿山研究院,云南玉溪653100 [3]会东鑫联矿业有限责任公司,四川会东615200 [4]昆明冶金高等专科学校,云南昆明650033

出  处:《湖南有色金属》2013年第1期1-6,53,共7页Hunan Nonferrous Metals

摘  要:淌塘铜矿于2006年8月建成投产,现已达到设计生产能力,矿山建有完善的开拓、运输系统,六中段为矿山的持续接替中段。文章在矿山生产现状调查和建立三维地质模型的基础上,应用DIMINE三维数字矿山软件系统的采矿设计功能,对六中段矿体可行的开采方案进行设计,通过对比分析后选择最优的开采方案,最后应用建立的三维模型对六中段回采进行整体规划。Tangtang copper mine was put into operation in August 2006 and has already reached the designed production capacity. The mine has perfect development and transportation system. The sixth level is a transitional level of mine development. With the application of mining design features in DIMINE 3 D mining software system, and based on mine production survey and the established three-dimensional geological model, several feasible mining plans of six middle ore body were designed. Therefore the optimal mining plan was selected through the comparative analysis of the feasible mining plans. The overall recovery program of the sixth level orebody is created based on the established three-dimensional geological model.

关 键 词:淌塘铜矿 DIMINE三维数字矿山软件系统 回采方案 

分 类 号:TD853[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象