检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北电力大学电气与电子工程学院,北京102206
出 处:《华东电力》2013年第2期264-269,共6页East China Electric Power
基 金:国家自然科学基金项目(51277071)~~
摘 要:提出了考虑水流滞时的短期梯级水电日优化调度模型。将水流滞时表示成平均出库流量的非线性函数形式,以反映梯级水电站间水流滞时的动态特性。同时,提出了针对复杂的水流滞时、水电转换、分段出力限制等非线性函数线性函数线性化建模的新方法,通过引入多组状态变量及相关约束,将梯级水电日优化调度问题转换为线性混合整数规划问题,最后,采用CPLEX商用软件包进行求解。通过对包含13个水库、44台机组的梯级水电系统的算例分析,验证了模型的合理性和方法的有效性。In this paper, daily optimal scheduling model for cascade hydropower stations considering the flow delay time was proposed. In this model flow delay time model was expressed as the nonlinear function of the average storage outflow, which could reflect the dynamic character of the delay time among cascade hydropower stations. Meanwhile, in view of the complicated non-linear function, like cascade delay time, hydraulic-electric conversion and piecewise output limit, a novel linear modeling method was proposed. The daily optimal scheduling problem was changed into a linear mixed integer programming problem by introducing multiple sets of state variables and constraints. And then the proposed model was solved by the commercial software of CPLEX. Actual calculation cascade hydropower system ex- ample containing 13 reservoirs and 44 hydropower units was tested. Results show that the proposed optimal model is rational, and the algorithm is effective.
关 键 词:梯级水电站 日优化调度 混合整数规划 滞时 线性化建模
分 类 号:TM73[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.12