检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《华东电力》2013年第2期385-389,共5页East China Electric Power
基 金:国家863高技术基金项目(2011AA05A118)~~
摘 要:基于负荷预测的不确定性建立了峰荷的隶属函数,并结合负荷的离散概率分布建立了负荷的模糊概率模型。根据威布尔分布的风电场的风速模型,用蒙特卡罗仿真方法评估电力系统的可靠性。通过可靠性测试系统IEEE-RTS79,分析比较了没有风电接入和风电大规模接入的情况,讨论了增加风电机组和常规机组对电力系统可靠性的影响。This paper formulates a peak load membership function based on the load forecast uncertainty, and establi- shes the load fuzzy probability model by combining with the load discrete probability distribution. Monte Carlo simula- tion is conducted to assess power system reliability according to the wind speed Weibull distribution model. Through reliability test system IEEE-RTS79, the reliability indices before and after wind power access are compared and the effects on power system reliability are discussed after adding wind turbine generators and conventional generators.
关 键 词:风电接入 负荷模糊概率模型 蒙特卡罗抽样 可靠性评估
分 类 号:TM74[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15