检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]Deptartment of Mathematics,Changzhou Institute of Technology [2]Institute of Management Engineering,Shanghai Second Polytechnic University
出 处:《Chinese Quarterly Journal of Mathematics》2012年第4期590-597,共8页数学季刊(英文版)
基 金:Supported by the National Natural Science Foundation of China(70731160015);Supported the National Natural Science Foundation of Jiangsu Province(yw06037)
摘 要:In this paper,we study a model on joint decisions of scheduling and subcontracting, in which jobs(orders) can be either processed by parallel machines at the manufacturer in-house or subcontracted to a subcontractor.The manufacturer needs to determine which jobs should be produced in-house and which jobs should be subcontracted.Furthermore,it needs to determine a production schedule for jobs to be produced in-house.We discuss five classical scheduling objectives as production costs.For each problem with different objective functions,we give optimality conditions and propose dynamic programming algorithms.
关 键 词:SCHEDULING SUBCONTRACTING dynamic programming parallel machines
分 类 号:O224[理学—运筹学与控制论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.112