作 者:刘新刚[1] 杨润[1] 常喜强[2] 林雪峰[1]
机构地区:[1]新疆电力设计院,新疆乌鲁木齐830001 [2]新疆电力公司电力调度中心,新疆乌鲁木齐830002
出 处:《水电能源科学》2013年第3期206-208,共3页Water Resources and Power
摘 要:针对"十二五"期间乌昌电网新增热电机组和可再生能源机组较多、调峰压力日益严重的问题,基于系统调峰容量平衡原理和乌昌电网对抽水蓄能电站的需求分析,确定了乌昌电网应建设一定容量的抽水蓄能电站,并通过分析模拟可知,乌昌电网建设1 200~1 600MW抽水蓄能电站后,有利于其安全、稳定、经济运行。Aiming at the problem that peaking regulation pressure has become more and more heavy because there are more new thermal units and renewable energy units during "Twelfth Five-Year Plan" period, on the basis of the principle of system peak load capacity balance and needs analysis for the Urumqi and Changji Power Grid, this paper comes to the conclusion that Urumqi-Changji Power Grid should be configured a certain capacity of the pumped storage power station during "Twelfth Five-Year Plan" period. Through analysis of the simulation calculation, it is known that the pumped storage power station is conducive to Urumqi and Changji Power Grid's safe, stable, and economic operation after Uru- mqi and Chang]i Power Grid are installed 1 200~1 600 MW pumped storage power station capacity.
关 键 词:抽水蓄能电站 负荷特性 风功率密度 调峰容量 火电综合调峰率
分 类 号:TM715[电气工程—电力系统及自动化] TM743
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249