检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]华北电力大学经济与管理学院,北京102206
出 处:《水电能源科学》2013年第3期217-219,共3页Water Resources and Power
基 金:国家自然科学基金资助项目(71071054);华北电力大学"211工程"基金资助项目(X10012)
摘 要:为强调风险对各项目目标的直接影响、突出项目目标之间的差异性,运用三角模糊数方法建立了基于项目目标的电网建设项目风险模糊评价模型,并结合西宁市某330kV变电站项目的实际情况,运用该模型评价了变电站项目的部分施工风险,根据评价结果对风险进行了描述和排序,从而验证了模型的实用性和可行性,同时为保证模型的准确性,在模型的实际应用中需根据项目情况调整模型的相关参数。For emphasizing the direct risk impact on each project objective and highlighting the difference among pro- ject objectives, construction risk fuzzy assessment model of grid project based on project objective was established by u sing triangular fuzzy number method. Combined with 330 kV substation project in Xining city, this paper used the model to assess some construction risks. Based on the assessment results, the risk was described and ranked, which demonstra ted the practicality and feasibility of the proposed model. Meanwhile, the model parameters should be adjusted in practical application so that the accuracy of the model could be ensured.
关 键 词:电网建设项目 三角模糊数 施工风险评价 项目目标
分 类 号:TM727[电气工程—电力系统及自动化] F282[经济管理—国民经济]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143