检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张飞[1] 王滨[1] 巩志忠[1] 崔志平[1] 刘文刚 冀杰
机构地区:[1]内蒙古科技大学矿业工程学院 [2]内蒙古石宝铁矿
出 处:《金属矿山》2013年第2期10-13,共4页Metal Mine
摘 要:矿柱回收顺序的选取对采空区处理过程中围岩的稳定性、安全性具有重大意义,矿柱回收顺序成为采空区处理课题研究的首要问题。采用FLAC3D,对东升庙铅锌矿2#采空区矿柱从一端到另一端顺序回采、从两端到中央推进回采、间隔跳采、从中央到两端推进这4种矿柱回收方法进行数值模拟,通过对比分析研究表明,比较合理的矿柱回收顺序为从中央向两端推进,可为安全生产提供保障。How to arrange the sequence of pillar recovery is of great significance to keep the stability and safety of surrounding rocks in mined-out processing. The sequence becomes the key issue to study the goat" treatment. FLAC3D numerical simulation is adopted to simulate four kinds of pillars'recovery at No. 2 goaf in Dongshenmiao lead-zinc deposit, that is, from one end to the other, from two ends to the middle, interval mining, and from the middle to both ends. Through con- trasting and analyzing, a more rational recovery sequence of from the middle to both ends is obtained, which can guarantee the production safety.
分 类 号:TD853.391[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117