检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:假冬冬[1,2] 邵学军[2] 蒋海峰 沈阳 张幸农[1] 尚毅梓[2]
机构地区:[1]南京水利科学研究院水文水资源与水利工程科学国家重点实验室,江苏南京210029 [2]清华大学水沙科学与水利水电工程国家重点实验室,北京100084 [3]南京港港务工程公司,江苏南京210011
出 处:《水科学进展》2013年第2期205-211,共7页Advances in Water Science
基 金:国家重点基础研究发展计划(973计划)资助项目(2012CB417002);国家自然科学基金资助项目(51109140)~~
摘 要:三峡水库2003年6月蓄水运用后,下游河道水沙过程已发生大幅变化,对于岸滩抗冲性较弱的荆江河道来说,河道的横向调整过程势必受到影响。采用考虑岸滩崩塌的河势研究数值模型,针对三峡水利枢纽工程运行所引发的水沙变异过程,初步探讨了荆江典型河道横向调整及河势变化对水沙条件变化的响应。对于下荆江石首河段来说,来沙减少后,冲刷加剧,局部河岸坍塌及平面变形加剧,主要发生在受弯道水流顶冲的位置,但河势演变趋势及平面变形总体上基本一致,并未发生较大变化。对于上荆江沙市—新厂河段来说,来沙量减小后,河道平面变形幅度总体上减小,局部最大减幅可达50%左右。The flow and sediment regimes downstream of Three Gorges Reservoir have undergone a significant change since the beginning of its impoundment in June 2003. Accordingly, the spatial variations in downstream channel mor- phology will be adjusted, in particular in the Jingjiang reach of the middle Yangtze River with eroded bank materials. In this study, the lateral migrations of channels in the Jingjiang reach in response to changes in flow and sediment re- gimes are investigated. The turbulent flow and sediment transport as well as the bank erosion process are simulated by two- and three dimensional numerical models. No significant changes can be found in the overall evolution of channel planform in the Shishou segment in the lower Jingjiang reach. However, localized bank collapses and plane deforma- tions are likely to intensify due to the reduction of sediment transport, especially on the apex of bend. For the Shashi- Xinchang segment in the upper Jingjiang reach, the overall evolution of channel planform is reduced compared to that before reservoir impoundment. Up to 50% reduction can be expected in some local segments.
关 键 词:水沙调节 三峡工程 河道演变 荆江 横向调整 数值模拟
分 类 号:TV147[水利工程—水力学及河流动力学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.157