检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏省水文水资源勘测局常州分局,江苏常州213000
出 处:《人民长江》2013年第5期78-81,99,共5页Yangtze River
摘 要:调水工程是一种改善水环境的工程措施,有必要对其引水效果和调度方式进行深入研究。根据常州市沿江水利枢纽2011年5月15~19日连续5 d调水试验的实测数据,分析了引水前后污染物浓度变化和引水流量与水质综合指数的关系,阐明了调水对常州市河道水环境的改善程度和范围。从水质改善的时效上看,连续3~4 d的翻水方案为较优方案。研究结果为地方水行政主管部门优化调度方案提供了技术支撑。Water diversion project is an engineering measure to improve water environment, so it is necessary to study its effect and diversion mode. On the basis of the measured data collected in 5 days from 15th to 19th, May, 2011 in the water diversion trial implemented by the hydro -junctions along the Yangtze River in Changzhou City, the relationship among pollutants concen- tration variation before and after the water diversion and water diversion discharge and water quality index is analyzed and the effect and range of river water improvement is il[lustrated. In the view of water quality improvement duration, the water pumping scheme of 3 to 4 continuous days is superior. The result can provide technical support for the regional water administration to opti- mize the operation scheme.
分 类 号:X52[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.83.123