检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈军团[1]
机构地区:[1]中铁第一勘察设计院集团有限公司线路运输处,陕西西安710043
出 处:《铁道运输与经济》2013年第3期20-25,29,共7页Railway Transport and Economy
摘 要:黔张常铁路建设区域内岩溶及岩溶水是对线路坡度选择影响最大、最为突出的工程地质问题。结合黔张常铁路线路的功能定位、区域路网的坡度情况、地形地质特征和工程风险,从与相邻线匹配性、运输安全性、运输质量和经济性等方面分别对本线的限制坡度为13‰和18‰的方案进行研究和比选。最后,推荐经济性好,能进一步拔高线路高程,有效分解长大隧道,减少工程风险的限制坡度为18‰方案。Inside the Qianjiang-Zhangjiajie-Changde railway construction area, karst and karst water are the most serious and extrusive geological problems which influencing the selection of track gradient. Combining with the function location of Qianjiang-Zhangjiajie-Changde railway track, gradient status of regional railway network, terrain and geological characteristics as well as engineering risk, this paper studies and compares the schemes of 13%o and 18%o limit gradient of the railway respectively from the aspects of matching rate with adjacent line, transport safety, transport quality and economical efficiency. In the end, the scheme of 18%o limit gradient is recommended, which has good economy, could improve track height in further step and effectively construct long tunnel in subsection and reduce engineering risk.
分 类 号:U212.34[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15