检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]三峡大学电气与新能源学院,湖北宜昌443000
出 处:《广东电力》2013年第2期25-29,60,共6页Guangdong Electric Power
摘 要:针对传统水电机组组合运行中容易出现振动故障的问题提出解决措施:先通过各台机组的实际水头H和一定导叶开度下有功出力P之间的变化规律,绘制出水头H和其对应的振动区边界的关系曲线,通过振动区边界曲线便可以求出每台机组自身的振动区域,然后运用动态规划法((dynamic programming method,DP)进行实际编程计算。最后通过某水电站的运行实例验证了所提方法的可行性。Aiming at vibration fault in traditional hydropower units combination, this paper proposes suggestions which is firstly to draw relationship curve of waterhead H and its vibration area boundary according to change rule of practical water- headH of each unit and active power output P under a certain guide vane opening by which it is able to determine vibration area of each unit own. Then by using dynamic programming method to proceed practical programme calculation and at last to verify feasibility of this method by practical operation of one hydropower station.
分 类 号:TK730[交通运输工程—轮机工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117