检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘琴
机构地区:[1]国网能源神头第二发电厂,山西朔州036011
出 处:《现代工业经济和信息化》2013年第2期86-87,90,共3页Modern Industrial Economy and Informationization
摘 要:神头第二发电厂1号机组MAX-1000分散控制系统趋势记录点数较少,而且保存周期较短,许多数据在INFI-90分散控制系统中无法监视,两个系统数据不共享。文章阐述了1号机组MAX-1000系统和INFI-90系统通讯项目的实施过程,详细介绍了实现这两个系统通讯的设备和关键技术点。The points of tendency records recorded by the scattered controlling system of Machine Set No.1 MXA-100 in Shentou No.2 Power Generation Plant is to some degree few and the restring period is somewhat short. A lot of data can not be monitored in the scattered controlling system of INFI-90 and data of the two systems is not shared with one another. This paper explains the implement procedure the communication project of Machine Sets No.1 MAX-1000 System and INFI-90 System, introducing the equipments and key technologies for the realization of the communication of the two systems.
关 键 词:MAX-1000系统 INFI-90系统 通讯 协议
分 类 号:TM769[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7