TiCl_4熔盐氯化过程通氯管道堵塞原因及对策分析  被引量:1

Analysis on Causes of and Countermeasures for Blockage of Chlorine Feeding Pipe in the Process of Molten Salt Chlorination

在线阅读下载全文

作  者:路辉[1] 杨仁牧[1] 蒙钧[1] 谢刚[2] 杨文[3] 

机构地区:[1]贵阳铝镁设计研究院,贵州贵阳550081 [2]昆明冶金研究院,云南昆明650031 [3]湖南有色金属研究院,湖南长沙410015

出  处:《钢铁钒钛》2013年第1期7-12,共6页Iron Steel Vanadium Titanium

摘  要:对TiCl4熔盐氯化过程通氯管堵塞的原因进行了分析,发现熔盐氯化温度、原料、压力、熔盐体系与操作情况是造成通氯管堵塞的主要因素;生产过程可以通过控制温度、压力、熔盐体系、操作参数,合理选择原料与优化设计来减少或避免通氯管堵塞问题的发生。The causes of the blockage of chlorine pipe in the process of molten salt chlorination for TiCl4 pro- duction are analyzed in this paper . It has been found that the main factors leading to blockage of chlorine pipe are temperature, raw materials, pressure, molten salt and operation. Some measures can be taken to re- duce or avoid the occurrence of blockage, including appropriate control of temperature, pressure, molten salt and operating parameters, reasonable choice of raw materials and optimization of desire scheme.

关 键 词:TICL4 熔盐氯化 通氯管堵塞 熔盐体系 

分 类 号:TF823[冶金工程—有色金属冶金] TF803.12

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象