检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王雨波[1,2] 王运敏[1,2] 汪斌[1,2] 杨永生[1,2]
机构地区:[1]中钢集团马鞍山矿山研究院有限公司 [2]金属矿山安全与健康国家重点实验室
出 处:《金属矿山》2013年第3期6-8,89,共4页Metal Mine
摘 要:针对某露天转地下矿采空区复杂的工程地质条件,利用正交试验对采空区以及露天采坑充填方案进行设计,通过对各充填方案稳定性分析以及经济比较,给出了采空区以及露天采坑最终充填方案,探明了充填方案对三期开采的影响,对复杂工程地质条件下的采空区胶结充填具有指导性的作用。In view of the complex engineering & geological condition of a goaf during transition from open pit to under- ground mining,the orthogonal experiment is used for the design of the goaf and open pit's backfilling scheme. Based on the stability analysis and economic comparisons of each backfilling scheme, the final backfilling scheme of goaf and open pit is given, and the impact of the backfilling on the third period project is pointed out. The research plays a guiding significance for the cementing filling of goaf under complex engineering geological conditions.
分 类 号:TD853.343[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28