公乌素矿1604综放工作面过断层技术研究  

Study on the Across Fault Technology in No. 1604 Full - mechanized Caving Mining Face of Gongwusu Coal Mine

在线阅读下载全文

作  者:张金山[1] 郑彦涛[1] 高国强[1] 刘伟[1] 孔维科[1] 

机构地区:[1]内蒙古科技大学矿业工程学院,内蒙古包头014010

出  处:《山西焦煤科技》2013年第2期18-20,共3页Shanxi Coking Coal Science & Technology

摘  要:断层构造是影响采煤工作面实现正常回采的一个重要因素,为解决公乌素矿1604综放工作面所遇到落差为10 m正断层F3的快速过断层问题,经分析该综放工作面的特殊地质构造和现场工况,实施了伪斜调整、强行割矸、放震动炮过断层的综合成套工艺,实现了安全、快速、经济过断层,为综放工作面遇到断层结构,采取合理有效地措施,提供了宝贵的经验。Fault structure is an important factor that restricts coal mining normally in coal face. In order to quickly across the F3 fault with 10 m fall in No. 1604 fully mechanized caving face of Gongwushu coal mine, by the analysis of the special geological structure and the site conditions in fully mechanized caving face, a series of comprehensive technology on across fault was implemented, such as pseudo incline adjustment, forcibly cut waste rock and blasting vibration shot. Realized safe, fast and economic across the fault, for fully - mechanized caving mining face encountered fault structures, the reasonable and effective measures are taken, provide valuable experience

关 键 词:综放工作面 断层 安全技术 

分 类 号:TD823.49[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象