作 者:耿灵生[1] 刘云[1] 刘莉莉[1] 巩向锋[1]
出 处:《水科学与工程技术》2013年第1期65-66,共2页Water Sciences and Engineering Technology
摘 要:通过重力坝结构的设计方案优化,充分利用当地河道的天然石材筑坝,采用自密实堆石混凝土结构。具有工期短、节约工程建设投资和节能低碳环保等优点,不但使坝体强度性能满足C30混凝土的设计要求,施工工期缩短1/3,工程造价节约20%,具有显著的经济效益和社会效益和较大的推广应用前景。Through the gravity dam structure design optimization, to make full use of the local rivers natural stone dam, so this article use the self-compacting concrete structure. The construction of Xingjiayu reservoir dam, has the advantoges of short shorten the construction period, greatly saving construction investment, energy saving, low carbon and environmental protection. This paper shows that uses self-compacting concrete can meet design requirements C30, shorten the 1/3 construction period , saved 20% of project cost, it will provide with the enormous economic benefits and social benefits, great popularization and application prospects.
分 类 号:TV5[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145