摘 要:宁南某水库首次蓄水后坝体出现数条宽度15—50mm的裂缝,在分析该工程勘察设计与施工资料的基础上,选取了3个桩号的典型横剖面,分别采用分层总和法和有限元法对坝体沉降变形进行了模拟计算,并将计算值与土坝变形实际观测数据进行对比分析.结果表明,坝体工后裂缝的主要原因是坝基湿陷性黄土及沟壑处理不彻底导致坝体不均匀沉降,进而产生裂缝.15 to 50 millimeter cracks were found in the earth dam from southern Ningxia after the reservoir was impounded at first time. Three typical sections were selected to calculate by using layerwise summation method and FEM based on analyzing the information of subject survey, design and construction. Then, the calculating data were compared with the site survey data. The results showed that the post-construction cracking is due to asymmetry settlement from incomplete firming for the collapsible loess and gully in the earth dam foundation.
关 键 词:土坝裂缝 自重湿陷性黄土 分层总和法 有限元法 不均匀沉降
分 类 号:TV641.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3