检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李日运[1] 王巍[1] 王新建[1] 杜雅峰[1]
出 处:《华北水利水电学院学报》2013年第2期55-58,共4页North China Institute of Water Conservancy and Hydroelectric Power
基 金:河南省高校杰出科研人才创新工程项目(HAIPURT)
摘 要:深基坑支护方案的选取受安全可行、经济合理、环境保护、施工便捷等相关指标因素的影响,且这些指标因素皆具有模糊性的特点.采用层次分析法确定各指标因素的权重,降低了专家对各指标因素进行评判时的主观性,运用模糊综合评判法评价支护方案的优劣,计算得到各方案的综合评价值,从而确定最优的支护方案,结合工程实例验证该方法确定的支护方案最优,支护效果很好.The selection of deep excavation support programs is affected by some indicators factors such as safe and feasible,reasonable economy,environmental protection,convenient construction and so on.However,all these indicators factors have a characteristic of fuzziness.AHP method is used to determine the factors of each index weight.This can reduce the subjectivity of experts judging various indicator factors.Therefore,fuzzy comprehensive evaluation method is used to evaluate the supporting projects,and then the comprehensive evaluation values of the programs are obtained to determine the optimal support program.Finally,combined with engineering examples,the method is verified to determine the optimal foundation bracing program.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249