检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐国庆[1] 岳丰田[2] 王弘琦[3] 张荣辉[3]
机构地区:[1]安徽省交通规划设计研究院,安徽合肥230088 [2]中国矿业大学,江苏徐州221116 [3]上海隧道工程股份有限公司,上海200082
出 处:《隧道建设》2013年第3期247-251,共5页Tunnel Construction
摘 要:杭州地铁1号线穿越的钱塘江地层中含有大量沼气,隧道在盾构推进过程中存在很大的工程风险。地层中沼气的赋存多为囊状形式存在,主要位于淤泥质粉质黏土与粉砂交界处。为了尽可能地将地层中的沼气释放出来,通过对试验段沼气进行释放施工,了解沼气的赋存特点并采取相应的释放技术,结合盾构隧道施工的工程特点,指导过江隧道段沼气释放安全施工,以达到降低盾构推进线路附近地层中沼气含量的效果。从盾构推进过程中未发现有沼气突出的情况看,释放效果比较好。Line 1 of Hangzhou Metro passes through Qiantang River formation, which contains large amount of methane. Therefore, there is great risk in shield tunneling. The methane is mainly located at the junction between the silty clay and silty sand. Methane releasing trials are made so as to understand the occurrence characteristics of the methane and, in turn, to make preparations to take countermeasures. During the shield tunneling, no methane outburst occurs, which demonstrates that the methane releasing is effective.
分 类 号:U455[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30